Table of Contents Project Description: ....................................................................... 2 Team Mission Assignment: ........................................................... 2 Team Identification and Responsibilities: ................................... 2 Measures of Success: ..................................................................... 2 Boundaries ...................................................................................... 2 Operating Guidelines ..................................................................... 3 Risk Management Plan: ................................................................ 4 Communication Plan ..................................................................... 5 Change Management Plan ............................................................ 5 Project Task Description: ............................................................. 6
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
The objective of this project will be to design a fire suppression system for the Pullman/ Moscow airport using domestic water. Team Mission Assignment: Design a storage tank and pipeline distribution system capable of maintaining a minimum of 20 psi. Also utilize local elevations to increase pressure head and limit the cost of extra materials. Team Identification and Responsibilities: Mark: Water Resources, EPAnet utilization Mike: Geotechnical analysis, AutoCAD design Nick: Structural analysis, cost estimation Measures of Success: Flow at hydrants meets airport standards Tank design meets Fire Marshal’s criterion Pipes and joints withstand long term pressure Pumps are reliable and efficient Client is satisfied Boundaries Funding Limits- Controlled by Moscow-Pullman Regional Airport. Geography- Pipeline needs to be at least 200 ft from runway by FAA standards. Hydrants also need to be spaced apart no more then 300 ft. Land near airport terminal on the north side of the airport can be utilized Legal and Regulatory- Design must follow FAA, City of Pullman, Whitman County, Washington state, EPA, and local fire district standards.
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 7

Ch5 Project Charter - Table of Contents Project...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online