922-095 Nortel Communication Server 1000E Rls.5.0 Install and Commissioning
A. The transfer status of the node is in progress. B. The node configuration is transferred to the elements. C. The transfer status of the node elements is unavailable. D. An element within the node failed to transfer the BOOTP or CONFIG files. Answer: C QUESTION:23 Upon opening the web browser to begin the login process into Element Manager on a Communication Server (CS) 1000E system, which two IP addresses can you enter into the address bar of the web browser? (Choose two.) QUESTION:24 A customer has successfully installed and configured a Signaling Server in a Communication Server (CS) 1000E system. After configuration and reboot, the Follower Signaling Server sends out BOOTP requests and waits for a response.