Course Hero Logo

Communication-Server-1000E-Rls-5-0-Install-and-Commissioning-(922-095).pdf

Course Hero uses AI to attempt to automatically extract content from documents to surface to you and others so you can study better, e.g., in search results, to enrich docs, and more. This preview shows page 1 - 4 out of 4 pages.

922-095NortelCommunication Server 1000E Rls.5.0 Install and Commissioning
A.The transfer status of the node is in progress.B.The node configuration is transferred to the elements.C.The transfer status of the node elements is unavailable.D.An element within the node failed to transfer the BOOTP or CONFIG files.Answer:CQUESTION:23Upon opening the web browser to begin the login process into Element Manager on aCommunication Server (CS) 1000E system, which two IP addresses can you enter intothe address bar of the web browser? (Choose two.)
QUESTION:24A customer has successfully installed and configured a Signaling Server in aCommunication Server (CS) 1000E system. After configuration and reboot, the FollowerSignaling Server sends out BOOTP requests and waits for a response.
End of preview. Want to read all 4 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Fall
Professor
Mohammad Alizadeh
Tags
IP address, Communication Server 1000E Rls

Newly uploaded documents

Show More

Newly uploaded documents

Show More

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture