Nortel-Converged-Campus-ERS-Installation--Configuration-(920-221).pdf - Nortel 920-221 Nortel Converged Campus ERS Installation Configuration

Nortel-Converged-Campus-ERS-Installation--Configuration-(920-221).pdf

This preview shows page 1 - 3 out of 6 pages.

920-221 Nortel Nortel Converged Campus ERS Installation & Configuration
Answer: B QUSETION:51 Two Ethernet Routing Switch 5530 systems are being deployed in a Split MultiLink Trunking (SMLT) configuration. What is the correct sequence of steps required to set the two standalone 5530 switches up as IST peers in a Layer 2 environment? A. Configure VLAN, configure STP, configure MLT, configure SMLT, make physical connections. B. Configure VLAN, configure Spanning Tree Protocol (STP), enable Global IP Routing, configure MultiLink Trunking (MLT), configure SMLT, make physical connections. C. Configure SMLT, enable Global IP Routing, make physical connections, configure VLAN, configure STP, configure MLT. D. Enable Global IP Routing, make physical connections, configure MLT configure STP, configure VLAN, configure SMLT. Answer:B QUSETION:52 You have created a DMLT group on the Ethernet Routing Switch (ERS) 4500 connecting to the ERS 8300 switch cluster core. Each stack of ERS 4500 switches will have a DMLT group created to connect them to the core. By default, which feature on all ERS 4500 ports enables Remote Fault Indication (prevention of single fiber faults)?

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture