{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

Study Guide - Project Management Solutions

Study Guide - Project Management Solutions - BK 1/3 Study...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
BK, 1/3 Study Guide -- Project Management Solutions The success of Sandra Bailey's recent project brought her the reputation that  she was hoping. Now, Sandra is in charge of another project at Reuters. The  list of the activities and their times (in weeks) and precedence relationships  are given below.  Activity Immediate  Predecessors Activity  Time A - 8 B - 5 C A 10 D A,B 9 E C,D 14 F C,D 7 G E,F 15 H G 8 I H 6 Develop all of the project plans by using this information. 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
BK, 2/3  ACTIVITY-ON-NODE (AON) REPRESENTATION a) Draw the project network graph by using AON representation. [ES, EF] {LS, LF}                           A, 8                     C, 10                    E, 14            [0, 8]                   [8, 18]                [18, 32] 
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}