Study Guide - Project Management Solutions

Study Guide - Project Management Solutions - BK, 1/3 Study...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: BK, 1/3 Study Guide -- Project Management Solutions The success of Sandra Bailey's recent project brought her the reputation that she was hoping. Now, Sandra is in charge of another project at Reuters. The list of the activities and their times (in weeks) and precedence relationships are given below. Activity Immediate Predecessors Activity Time A- 8 B- 5 C A 10 D A,B 9 E C,D 14 F C,D 7 G E,F 15 H G 8 I H 6 Develop all of the project plans by using this information. BK, 2/3 ACTIVITY-ON-NODE (AON) REPRESENTATION a) Draw the project network graph by using AON representation. [ES, EF] {LS, LF} A, 8 C, 10 E, 14 [0, 8] [8, 18] [18, 32] {0, 8} {8, 18} {18, 32}...
View Full Document

This note was uploaded on 04/07/2008 for the course MGT 303 taught by Professor Kazaz during the Fall '06 term at University of Miami.

Page1 / 3

Study Guide - Project Management Solutions - BK, 1/3 Study...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online