Making Muffins What are the steps necessary to make a product?
2
Making Muffins 3 What time is required for each step in the Process? ORDER MIX TRANSFER BAKE COOL PACK PAY start 6 min 2 min 10 min 5 min 2 min 1 min * Assume for 1 dozen muffins Cycle Time/ Throughput = 26 min
Making Muffins 4 What is the Capacity? (how much can be done over time?) ORDER MIX TRANSFER BAKE COOL PACK PAY start 6 min 2 min 10 min 5 min 2 min 1 min dozen/ hr, what is the Rate Limiting Step? start 60 min/6 60 min/2 60 min/10 60 min/5 60 min/2 60 min/1 Start 10 doz/hr 30 doz/hr 6 doz/hr 12 doz/hr 30 doz/hr 60 doz/hr