ISTQB-Advanced-Lev3QUESTION:52Select the correct answer;I. Verifying "what" the product does is part of functional testing.II. Usability Testing is a domain/functional testing technique.III. Inspection, evaluation and reviews are usability test techniques.IV. Understandability, learnability and attractiveness are attributes of usabilityD
QUESTION:53According to the ISTQB syllabus, domain testing quality attributes are;I. Accuracy, Suitability, InteroperabilityII. Reliability, Maintainability, PortabilityIII. Performance, load, AdaptabilityD
QUESTION:54Select the correct statement(s). According to the ISTQB Syllabus;I. Unauthorized access & copying, buffer overflow, logic bombs are part of Technical SecurityTesting.II. Fallback, backup and restore activities are part of recoverability testing.III. Verifying whether a system can handle peak loads at or above maximum capacity is calledstress testing.IV. Verifying whether a system can "meet future efficiency requirements" is called scalabilitytesting26
ISTQB-Advanced-Lev3D
QUESTION:55A Software Test Analyst at ABC company. received a new software release and the installationguide from Development. He followed the installation guide and successfully installed thesoftware. Then he followed the fallback instructions and performed a successful fallback. Afterverifying that the software has completely fallen back as desired, he re-installed the software.What type of testing activity did he do?A. Portability testingB. Efficiency testingC. Reliability testingD. Usability TestingAnswer:A
QUESTION:56Which of the following statements are correct?I. IEEE 1028 is an international standard on reviews.II. Early reviews are very cost effective in finding defects.III. Review is considered a static testingIV. Most documents can be reviewed (source code, requirements document, test plandocument)C
QUESTION:57You are a test analyst for XYZ Company. CEO of XYZ sent a meeting entry to you and yourmanager for a past project evidence and test deliverables review. A person from an external27
ISTQB-Advanced-Lev3company would like to interview you regarding the previous project. This activity has a veryhigh visibility from upper management. What type of review is described above?

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 11 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Fall
Professor
Mohammad Alizadeh
Tags
Test Manager

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture