ISTQB-Advanced-LevelTechnical-Test-(ISTQB-Advanced-Level-3).pdf - ASTQB ISTQB-Advanced-LevelISTQB Advanced LevelTechnical Test

ISTQB-Advanced-LevelTechnical-Test-(ISTQB-Advanced-Level-3).pdf

This preview shows page 1 - 5 out of 11 pages.

ISTQB-Advanced-Level- ASTQB ISTQB Advanced LevelTechnical Test
Image of page 1
ISTQB-Advanced-Lev3 QUESTION: 52 Select the correct answer; I. Verifying "what" the product does is part of functional testing. II. Usability Testing is a domain/functional testing technique. III. Inspection, evaluation and reviews are usability test techniques. IV. Understandability, learnability and attractiveness are attributes of usability A. I, II, III true, IV false B. II, III, IV true. I false C. I, II true. III, IV false D. All of the above true Answer: D QUESTION: 53 According to the ISTQB syllabus, domain testing quality attributes are; I. Accuracy, Suitability, Interoperability II. Reliability, Maintainability, Portability III. Performance, load, Adaptability A. All of the above B. None of the above C. I and II true. III false D. I true. II, III false Answer: D QUESTION: 54 Select the correct statement(s). According to the ISTQB Syllabus; I. Unauthorized access & copying, buffer overflow, logic bombs are part of Technical Security Testing. II. Fallback, backup and restore activities are part of recoverability testing. III. Verifying whether a system can handle peak loads at or above maximum capacity is called stress testing. IV. Verifying whether a system can "meet future efficiency requirements" is called scalability testing 26
Image of page 2
ISTQB-Advanced-Lev3 A. I, II and III true. IV false B. I, IV true. II, III false C. II, III true. I, IV false D. All of the above are true Answer: D QUESTION: 55 A Software Test Analyst at ABC company. received a new software release and the installation guide from Development. He followed the installation guide and successfully installed the software. Then he followed the fallback instructions and performed a successful fallback. After verifying that the software has completely fallen back as desired, he re-installed the software. What type of testing activity did he do? A. Portability testing B. Efficiency testing C. Reliability testing D. Usability Testing Answer: A QUESTION: 56 Which of the following statements are correct? I. IEEE 1028 is an international standard on reviews. II. Early reviews are very cost effective in finding defects. III. Review is considered a static testing IV. Most documents can be reviewed (source code, requirements document, test plan document) A. I, II and III true B. I, III and IV true C. I, II, III and IV true D. II, III and IV true Answer: C QUESTION: 57 You are a test analyst for XYZ Company. CEO of XYZ sent a meeting entry to you and your manager for a past project evidence and test deliverables review. A person from an external 27
Image of page 3
ISTQB-Advanced-Lev3 company would like to interview you regarding the previous project. This activity has a very high visibility from upper management. What type of review is described above?
Image of page 4
Image of page 5

You've reached the end of your free preview.

Want to read all 11 pages?

  • Fall '16
  • Mohammad Alizadeh
  • Test Manager

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture