acctg 213 ch 6 hw

acctg 213 ch 6 hw - Jeremy Liebman 950929750 Tomcal Chapter...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Jeremy Liebman 950929750 Tomcal Chapter 6 Homework Ex- 25, 26, 28, 29, 30, 31, 32, 33, 34, 35, 38 P-43, 46, 48 25. 1) Scented Cards Regular Cards Inspection hours 0.20 0.80 Setup hours 0.50 0.50 Machine hours 0.25 0.75 Number of moves 0.75 0.25 2) The consumption rations will change when dealing with separate drivers. It depends on what you base the consumption ration on (ie machine hours, direct labor, etc). 26. 1. Rates: Inspecting products: $10 per inspection hour Setting up equipment: $25 per setup hour Machining: $5 per machine hour Moving materials: $3.00 per move 2. Inspection hours = 100 inspection hours 28. 1a. Activity rate = $36/setup hour 1b. Activity rate = $100/oven hour 2. Total overhead costs assigned to Fudge (ABC rates): = $48,800 3. Unit overhead assigned to Fudge = $48.80 4. Plant-wide overhead rate based on oven hours = $130/oven hour 5. Total overhead costs assigned to Fudge (plant-wide rate) = $26,000 29. 1. Normal Intensive
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 4

acctg 213 ch 6 hw - Jeremy Liebman 950929750 Tomcal Chapter...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online