Scheduling Scheduling and Planning and Planning Chapter 6 180: 305
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Project Control Project Control Time Cost Quality
Background image of page 2
Activities Activities Projects consist of many separate work tasks Some simultaneous Some must follow previous tasks Must be logical Physical constraints
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Traditional Methods Traditional Methods Bar Charts Limitations Does not show relationship between activities Does not describe the sequence of work
Background image of page 4
Production curves Production curves Reflects the speed with which sections are being processed High- rise buildings Highways
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Project Planning Project Planning Work methods Crafts involved Resources Administrative actions Deliveries special activities
Background image of page 6
Break project into activities Sequence of work What must be done before an activity can start What activities follow. Must decompose projects into discrete activities
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 8
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/09/2009 for the course CIVIL ENGI 180:305 taught by Professor Williams during the Fall '07 term at Rutgers.

Page1 / 12

305Chap6Scheduling - Scheduling and Planning Chapter 6 180 305 Project Control Time Cost Quality Activities Projects consist of many separate work

This preview shows document pages 1 - 8. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online