Material Management Chapter 16
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Materials Ordered from a supplier - Order - Approval process - Fabrication and delivery - Installation
Background image of page 2
Figure 16.2 (p. 276) Material life cycle.
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Purchase Order Purchase contract between contractor and supplier Can be simple or complex Special Instructions - Delivery Information FOB-Free on Board CIF-Cost, Insurance and Freight COD-Cash on Delivery
Background image of page 4
Figure 16.3 (p. 277) Field purchase order (courtesy of Henry C. Beck Co.).
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Figure 16.4 (p. 278) Formal purchase order (courtesy of Henry C. Beck Co.).
Background image of page 6
Figure 16.5 (p. 279) Procurement documents and title transfer sequence.
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Figure 16.6 (pp. 280-281) Typical bill of lading (courtesy of Augusta Meadow Steel Products, Inc.) (Continued on next slide.)
Background image of page 8
Figure 16.6b (cont.)
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Figure 16.7 (p. 282) Typical invoice (courtesy of Bibb Steel & Supply Company).
Background image of page 10
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 12
Background image of page 13

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 14
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Approval Process Contractor is required to make submitals to further amplify original design.-Shop drawings-Product data-Samples What is a shop drawing? Design done by architect or engineer may not be specific enough to be fabricated. Contractor prepares a detailed drawing that is approved by the designer. Most often seen with structural plans-connnections Exact details left to the contractors discrection Approval cycle Submitted by sub or supplier Reviewed by the prime contractor Reviewed by the designer Approval granted and submital returned to supplier or sub. Timing of submitals Must include lead time If notproject may be delayed awaiting approvals...
View Full Document

Page1 / 14

305chap16 - Approval Process Contractor is required to make...

This preview shows document pages 1 - 14. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online