UnicoPropertiesElephantCorralCaseStudy.pdf - CITY AND...

This preview shows page 1 out of 1 page.

CITY AND COUNTY OF DENVER ELEPHANT CORRAL CASE STUDY DENVER SMART LEASING PROGRAM Denvergov.org/smartleasing Richard Wren, Chief Engineer, describes how tenant comfort has improved and HVAC requests have significantly reduced as a result of energy efficiency measures. “Tenant comfort has improved significantly since Unico’s purchase and subsequent renovation of the building. Since we’ve upgraded the major base building systems and added controls, we’ve more than halved our tenant HVAC related requests from 51 in 2018 to 25 in 2019.” Check out the Smart Leasing Webpage and sign up for our newsletter! Take the pledge Connect with us! Unico acquired the Elephant Corral building in early 2016, a 130-year-old property with inefficient building infrastructure and systems that were leading to increased operating expenses and tenant discomfort. Outdated HVAC controls and building materials in the atrium led to 20-degree temperature fluctuations. Several of the chilled and hot water

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture