Building Code of the Philippines(1)

Form no 77 004 e republic of the philippines ministry

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: PHONE _________ MOTORS ___________ HP ______ OTHERS (specify) ____________________________________________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ In-charge of construction If construction is undertaken by contract ____________________________________________ _________________________________ ELECRTRICAL ENGINEERING/MASTER ELECTRICIAN CONTRACTOR P.R.C. Reg. No. _________________ Date _________________ P.R.C. Reg. No. ___________ Class ____________ TAN _____________ Res. Cert. ___________ Date __________ TAN __________ Res. Cert. ______ Date ________ Address ______________________________________________ Address ____________________________________ Conforme ___________________________________ OWNER/APPLICANT (For statistical purposes only) NUMBER OF STORIES ______________________________________________________________ ESTIMATED COST __________________________________________________________________ ACTUAL COST _____________________________________________________________________ a) Materials (Total Cost) P 1. Electrical wires ________________________________________________________ 2. Lighting outlets _______________________________________________________ 3. Convenience outlets ____________________________________________________ 4. Switches _____________________________________________________________ Others (specify) ________________________________________________________ _____________________________________________________________________ b) Other costs _____________________________________________________________ This includes professional fees, permits and other fees. Master Electricians can sign for electrical installation up to 20 outlets or up to 4kw. WORK SHEET III. ELECTRICAL SECTION 1. Loads to be Connected: Convenience outlets ___________________ Switches ____________________________ Bell System __________________________ Elec. range ___________________________ Generator ____________________________ Communication ________________ Light _________________________ Others (specify) ________________ ______________________________ ______________________________ 2. Nature of Works: _______________________________________________________________ 3. Type of Service: Voltage _____________ Size of Wire _____________ Phone _____________ 4. Remarks: _____________________________________________________________________ _______________________________________________________________________ I hereby certify that the above data and information are true and correct to the best of my knowledge and belief. ________________________________________ __________________________________________ Electrical Engineer/Master Electrician ELECTRICAL FESS Computed by: ________________________________________ P.T.C. No. ________________________________ P.T.R. No. _____...
View Full Document

This note was uploaded on 09/22/2013 for the course ARIDBE AR taught by Professor Any during the Fall '12 term at Mapúa Institute of Technology.

Ask a homework question - tutors are online