Building Code of the Philippines(1)

Be done under the supervision of a representative

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: he premises of _____________ ___________________________________________________ for a period of thirty (30) days inclusive from ____________________________________, 19 _____ to ____________, 19 _____ pursuant to pertinent provisions of the National Building Code (P.D. 1096) and its Implementing Rules and Regulations and to the following conditions: 1. The owner and contractor shall be jointly responsible for the safety, protection, security and convenience of the general public and his/her personnel, third parties, the works, equipment, installation and the like. 2. The scaffolding shall not be erected on the roadway area nor shall it obstruct the free passage of pedestrians. 3. Surface drains and other utility fixtures or lines shall not be obstructed. 4. This permit must be kept at the jobsite at all times for the duration of the project. It may be cancelled or revoked pursuant to Section 305 and 306 of the National Building Code (P.D. 1096) or when public interest so demands. Fee: _____________________ O.R. No. __________________ Date: _____________________ ____________________________________ Building Official MPW Form No. 77-018-B Republic of the Philippines Ministry of Public Works OFFICE OF THE BUILDING OFFICIAL Permit No. ___________________________________ Sidewalk Permit No. District/City/Municipality ______________________ Area Code ______________________ _____________________ ______________________ Date Issued _____________________ Date Issued TEMPORARY SIDEWALK ENCLOSURE AND OCCUPANCY PERMIT Permit is hereby granted to _______________________________________________________ with postal address at _________________________________________________________________ for the enclosure and the occupancy of the sidewalk with a frontage of __________________________ ( ) meters and a width of _____________________ ( ) meters or ________________________ square meters as indicated at the back hereof at the premises of ________________________________ _________________________ for the storage of construction materials for a period of _____________ ______________________________ ( ) days inclusive from ___________________, 19 ______ to _____________________, 19 _______ pursuant to pertinent provisions of the National Building Code (P.D. 1096) and its implementing rules and regulations, subject, further, to the following conditions: 1. The owner and contractor shall be solely responsible for the safety, protection, security and convenience of the general public and his/her personnel, third parties, the works, equipment, installation and the like. 2. No enclosures shall be made without first providing the required temporary sidewalk plank which shall be properly maintained at all times. 3. The enclosure shall be made of wooden T & G, Gauge 26 corrugated G.I., or any other similar materials at least two meters (2.00 M) high, structurally sound and luminously painted for the safety and conveniece of pedestrians. The width of the sidewalk to be o...
View Full Document

This note was uploaded on 09/22/2013 for the course ARIDBE AR taught by Professor Any during the Fall '12 term at Mapúa Institute of Technology.

Ask a homework question - tutors are online