Building Code of the Philippines(1)

Of tanks200 9133 reinstallation of

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: st Class 1st Class Cities Municipalities 10.1 10.2 10.3 10.4 10.5 11. Plain tombs, cenotaphs or Monuments without backdrop Wall, canopy or roofing Exempt Canopied tombs, wether partially Or totally roofed over, per sq.m. Of covered area 4.00 Exempt Exempt 3.00 2.00 Semi-enclosed mausoleums, Per sq.m. of built-up area 4.00 4.00 3.00 Totally enclosed mausoleums, Per sq.m. of floor area 10.00 8.00 2.00 Multi-level interment niches, Per sq.m. of floor area, per level Sanitary / Plumbing Permit Fees: 4.00 3.00 2.00 11.1 Installation Fees: a.) One unit, composed of one water closet, two floor drains, one lavatory, two faucets and one shower head …………………………………………… 20.00 b.) Every fixture in excess of one unit: 1. Each water closet …………………………………………… 6.00 2. Each floor drain …………………………………………… 2.00 3. Each sink …………………………………………… 2.00 4. Each lavatory …………………………………………… 6.00 5. Each faucet …………………………………………… 1.50 6. Each shower head …………………………………………… 1.50 7. Each slop sink …………………………………………... 6.00 8. Each Urinal …………………………………………… 3.00 9. Each bath tub …………………………………………… 6.00 10. Each grease trap …………………………………………… 6.00 11. Each garage trap …………………………………………… 6.00 12. Each bidette …………………………………………… 3.00 13. Each dental cuspidor …………………………………………… 3.00 14. Each gas-fired water heater………………………………………. 3.00 15 Each drinking fountain ………………………………………….. 1.50 16. Each bar or soda fountain sink…………………………………… 3.00 17. Each laundry sink …………………………………………… 3.00 18. Each laboratory sink …………………………………………… 3.00 19. Each fixed-type sterilizer…………………………………………… 1.50 20. Each water meter …………………………………………… 1.50 11.2 Construction of specific vault: a.) Category I (Residential) ……………………………………… Exempted b.) All other categories: 1. Up to 5 cu.m. of digestion chamber……………………. 20.00 2. Every cu.m. or fraction thereof in excess of 5 cu.m….. 6.00 12. ELECTRICAL PERMIT FEES: 12.1 Lighting and Power System: a.) Each switch, lighting and or convenience outlet…………………. .80 b.) Each remote control master switch ………………………….20.00 c.) Each special purpose outlet of 20 amperes capacity or more….. 2.00 d.) Each time switch …………………………………………….. 2.00 12.2 Appliances for commercial / industrial use: a.) Each...
View Full Document

This note was uploaded on 09/22/2013 for the course ARIDBE AR taught by Professor Any during the Fall '12 term at Mapúa Institute of Technology.

Ask a homework question - tutors are online