Building Code of the Philippines(1)

Per unit 6000 b

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: KW ………………………………………………….. 4.00 Above 1 KW up to 5 KW ………………………………………… 8.00 Above 5 KW up to 10 KW………………………………………. 10.00 Above 10 KW up to 20 KW……………………………………… 20.00 Every KW or fraction thereof in excess of 20 KW……………. 1.00 Transformer and Sub-station Equipment: a.) Each transformer up to 1 KVA ……………………………….. 2.00 b.) Every KVA or fraction thereof in excess of 1 KVA up to 2,000 KVA, (based on nameplate rating)……………………. 1.00 c.) Each transformer above 2,000 KVA …………………………. 2,000.00 d.) Each safety switch or circuit breaker up to 50 amperes and not exceeding 600 volts……………………………………….. 2.00 e.) Each safety switch, air circuit breaker, Oil circuit breaker or vacuum circuit breaker, other than motor controlling apparatus, above 50 amperes up to 100 amperes, and not exceeding 600 volts ……………………………………… 4.00 f.) Every 50 amperes or fraction thereof in excess of 100 amperes. 1.00 h.) Every 10,000 amperes or fraction thereof of interrupting capacity Of every air circuit breaker or vacuum circuit breaker operating Above 600 volts. ………………………………………. 4.00 NOTE:Machinery, equipment and installation of utility companies used in the generation, transmission and distribution of power shall not be subject to Permit and Inspection fees. 12.9 Each temporary lighting or convenience outlet for celebrations, ferias or construction purposes …………………………………………………….. 0.80 12.10 Other electrical apparatus or appliances not otherwise provided in this section KW or fraction thereof …………………………………………… 4.00 12.11 Temporary Current Connection: a.) Every Temporary Current Connection Permit shall be issued for testing purposes only in commercial and / or industrial establishment: Regular fees shall be charged and collected in accordance with the fees prescribed in this Sections. b.) If no final approval is issued within 60 days, a new wiring permit shall and all corresponding permit fees shall be paid. be secured 12.12 Pole / Attachment Location Plan Permit: a.) Approved Pole Location Plan Permit, per pole: 1. Metro Manila ………………………………………… 20.00 3. All other cities and municipalities…………………….. 10.00 b.) Approved Attachment Location Plan Permit, per attachment: 1. Metro Manila ………………………………………... 20.00 2. All other cities and municipalities…………………….. 10.00 12.13 Miscellaneous Fees: 12.13.1 Each union separation, alteration, reconnection or relocation of electric meter: a.) Residential ……………………………………….. 10.00 b.) Commercial / Industrial ……………………………… 40.00 c.) Institutional …………...
View Full Document

This note was uploaded on 09/22/2013 for the course ARIDBE AR taught by Professor Any during the Fall '12 term at Mapúa Institute of Technology.

Ask a homework question - tutors are online