Building Code of the Philippines(1)

Promulgation of pd 1096 shall be required to secure

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1.3 As-built plans (location and site plan, Architectural, Structural, Electrical, Mechanical, and Sanitary/Plumbing Plans), signed and sealed by a duly licensed Architect or Civil Engineer in case of architectural and structural plans, by a duly licensed Professional Electrical Engineer in case of electrical plans, by a duly Professional Mechanical Engineer in case of mechanical plans, by a duly licensed Sanitary Engineer in case of sanitary or plumbing installation of more than 20 units or Master Plumber in case of sanitary or plumbing installations not exceeding 20 units. NOTE: If the building/structure is found to be non-conforming with the approved zoning map, the pertinent provisions of the zoning ordinance of the locality shall be applied. 1.4 Certifications from a duly licensed Civil Engineer, Electrical Engineer, Mechanical Engineer, Sanitary Engineer or Master Plumber, that the building/structure is structurally safe and the electrical-mechanical and sanitary installation are in order. 1.5 Fire Safety Inspection Certificate issued by the Chief of Local Fire Service, INP. 1.6 NPCC Certificate in the case of Industrial Buildings. 2. The Building Official may inspect the building to confirm the contents of the documents. If the Building Official is satisfied that all requirements have been compiled with, he shall issue the Certificate of Occupancy. 3. At the instance of the owner or with his written consent or authorization in each case, buildings under Categories II and III constructed prior to the promulgation of P.D. 1096 in all other Cities and Municipalities without building ordinances or requirements for Certificates of Occupancy, may be issued a Certificate of occupancy by the Building Official following the same procedures enumerated above and after payment of the corresponding fees therefor. 4. Building under Category I in all Cities and Municipalities whether or not with an existing building ordinances prior to P.D. 1096, may be issued Certificates of Occupancy by the Building Official at the instance of the owner or upon his written request or authorization provided that the same procedures (1 to 2) above are followed and after payment of the corresponding fees therefor. FEES: 4.1 Category I (For Metro-Manila and 1st Class Cities) a) Buildings with area not exceeding 100 sq. m. . . . . . . . P 50.00 b) Buildings with area above 100 sq.m. to 200 sq.m. . . . 75.00 c) Buildings with area above 200 sq.m. to 300 sq.m. . . . 100.00 d) Buildings with area above 300 sq.m. to 500 sq.m. . . . 200.00 e) Buildings with area above 500 sq.m. . . . . . . . . . . . . . 400.00 4.2 For all Cities and Municipalities the fees shall be 50% of the above rates. 4.3 Category II (For Metro-Manila and 1st Class Cities) a) Buildings with area up to 5,000 sq..m. . . . . . . . . . . . . 50.00 b) Buildings with area above 5,000 sq.m. up to . . . . . . . . 10,000 sq.m. 100.00 c) Buildings with area above 10,000 sq.m. up to . . . . . . . 20,000 sq.m. 200.00 d...
View Full Document

Ask a homework question - tutors are online