Building Code of the Philippines(1)

Reconstruction is done which twelve 12 months from

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: moving converting, or demolishing a building or structure without a building permit. 9.2 Making any alteration, addition, conversion or repair in any building or structure or appurtenances thereto, constructed or installed before the adoption of the code, whether public or private, without a permit. 9.3 Unauthorized change, modification or alteration during the construction in the duly approved plans and specifications on which the building permit is based. 9.4 Non-compliance with work stoppage order and/or orders to effect necessary correction in plans and specifications found defective. 9.5 Non-compliance with order to demolish buildings declared to be nuisance, ruinous or dangerous. 9.6 Use or occupancy of a building without a Certificate of Occupancy even if constructed under a valid building permit. 9.7 9.8 Failure to post or display the certificate of occupancy in a conspicuous place on the premises of the building as required under Section 309 of the Code. 9.9 10. Change in the existing use or occupancy classification of a building or structure or portion thereof without the corresponding Certificate of Change of Occupancy. Change in the type of construction of any building without approval of the Building Official. Determination of Amount of Fines: In the determination of the amount of fines to be imposed for violation under the preceding Section, the Minister or his duly authorized representative shall take into consideration the following: 10.1. Light Violation 10.1.1 Failure to post Certificate of Occupancy 10.2 Less Grave Violations 10.2.1 Non-compliance with work stoppage order for alteration/addition/conversion/ repair without permit. 10.2.2 Use of occupancy without Certificate of Occupancy. 10.2.3 Change in existing use or occupancy without Certificate of Change of Occupancy. 10.3 Grave Violations 10.3.1 Unauthorized changes during construction. 10.3.2 Unauthorized change in type of construction from more fire-resistive to less fireresistive. 10.3.3 Non-compliance with order to abate or demolish 10.3.4 Non-compliance with work stoppage order for construction without permit. Fines in Pesos (P) Light Violations Less Grave Violations Category I Minimum Medium Maximum 50 50 50 250 500 1,000 500 1,000 2,000 Grave Violations Category II & III Minimum Medium Maximum 100 100 100 1,000 2,500 5,000 2,000 5,000 10,000 Note: * The Minimum fines shall be imposed for failure to comply with the terms of the 1st notice. * The Minimum fines shall be imposed for failure to comply with the terms of the 2nd notice. * The Minimum fines shall be imposed for failure to comply with the terms of the 3rd and final notice. 11. Surcharge/ Penalty: Without prejudice to the provisions of the preceding sections, the Building Official is hereby also authorized to impose a penalty or surcharge in the following cases in such amount and in the manner as hereunder fixed and determined: 11.1 for constructing, installing, repairing, altering or causing any change in the use or occ...
View Full Document

This note was uploaded on 09/22/2013 for the course ARIDBE AR taught by Professor Any during the Fall '12 term at Mapúa Institute of Technology.

Ask a homework question - tutors are online