Building Code of the Philippines(1)

Sidewalks towers signboards etc 2 administrative

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: neer to undertake the full time inspection and supervision of the construction work and/or failure of the licensed architect or civil engineer hired to keep at all times at the jobsite a logbook (of the progress of construction). 4. Grounds for Non-issuance or Revocation of Certificate of Occupancy: The Building Official may direct the non-issuance or revocation of certificate of occupancy based on any or all of the following grounds: 4.1 4.2 Failure to engage the services of a duly licensed architect or civil engineer to undertake the full time inspection and supervision of the construction work and/or failure of the licensed architect or civil engineer hired to keep at all times at the jobsite a logbook (of the progress of construction). 4.3 5. Unauthorized change, modification or alteration in the approved plans and specifications and/or in the type of construction. Failure of the licensed Architect or Civil Engineer who undertook the full time inspection and supervision work to submit the logbook, Certificate of Completion, As-built plans, Specifications, Building Inspection Sheet and Fire Safety Inspection Certificate duly signed and sealed, to the Building Official upon completion of the construction. Issuance of Work Stoppage Order: The Building Official shall conduct regular inspection of buildings or structures and their premises within his area of jurisdiction. He may direct or order the stoppage of work based on any or all of the following grounds: 5.1 Non-compliance with terms and conditions of permits. 5.2 5.3 Failure of the licensed Architect or Civil Engineer who undertook the full time inspection and supervision work to submit the logbook, Certificate of Completion, As-built plans, Specifications, Building Inspection Sheet and Fire Safety Inspection Certificate duly signed and sealed, to the Building Official upon completion of the construction. 5.4 Erecting, construction, altering, moving, converting, or demolishing a building or structure without a building permit. 5.5 Making any alteration, addition, conversion or repair in any building or structure or appurtenance thereto, constructed or installed before the adoption of the Code, whether public or private, without a permit. 5.6 6. Unauthorized change, modification or alteration in the approved plans and specifications and/or in the type of construction. Unauthorized change, modification or alteration during construction from the duly approved plans and specifications on which the building permit is based. Issuance of Order for Discontinuance of Use or Occupancy. The Building Official shall conduct regular inspection of buildings or structures and their premises within his area of jurisdiction. He may direct or order the discontinuance of use or occupancy of buildings or structures based on any or all of the following grounds: 6.1 Dangerous or Ruinous Building specified under Sec. 3 of Rule VII of the Implementing Rules and Regulations. 6.2 Use of occupancy of a building without...
View Full Document

Ask a homework question - tutors are online