Building Code of the Philippines(1)

Therefor is filed with the building official together

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ……………………………………………P 10.00 Category II ………………………………………………… 30.00 Category III ………………………………………………… 20.00 Category IV ………………………………………………… 5.00 Category V …..accdg. to category of principal building/structure. All other cities and municipalities: 50% of the above rates. 7. Establishment of Line and Grade: 7.1 Metro Manila and First Class Cities: a.) All sides fronting or abutting-streets, esteros, rivers and creeks: 1. First 10 meters …………………………………………………..P 20.00 2. Every meter or fraction thereof In excess of 10 m ………………………………………… 1.00 b.) 7.2 8. All other sides: Every meter of fraction thereof ……………………………… 0.50 All other cities and municipalities: 50% of the above rates. Schedule of Building Permit Fees: 8.1 The building Permit Fee includes the excavation fee for the foundation. However, while the application is still being processed, the Building Official may allow excavation for the foundation and basement, for which the following fees shall be charged: a.) Excavation for foundation Per cu.m. of excavation………………………………………………. 2.00 Excavation for basement, Per cu.m. of excavation………………………………………………..2.00 NOTE:The fee paid therefor shall be deducted from the total building permit Fees. 8.2 Construction / addition / renovation / alteration of buildings under CATEGORY shall be assesed according to the following rates: b.) Metro Manila 2nd Class All Others And all Cities and A R E A 1st Class 1st Class Cities Municipalities Fee / sq.m. Fee / sq.m. Fee / sq.m. -----------------------------------------------------------------------------------------------------------a.) Original complete Exempted Exempted Exempted construction up to 20 sq.m. b.) Addition/ renovation P 2.00 P 1.50 P 1.00 alteration up to 20 sq.m. c.) Above 20 sq.m/ 2.00 1.50 1.00 up to 50 sq.m. d.) Above 50 sq.m. 4.00 3.00 2.00 up to 100 sq.m. e.) Above 100 sq.m. 5.00 4.00 2.00 up to 150 sq.m. f.) Above 150 sq.m. 6.00 5.00 3.50 * Regardless of floor area of original construction. NOTE:For CATEGORY I buildings the area and the rate corresponding to the properarea bracket are multiplied directly. Examples: A single detached dwelling within Metro Manila with a floor 75 sq.m. area of Sample Computation: Location is Metro Manila, therefore use 1st column of fees. Floor area = 75 sq.m. Therefore area bracket is (d), Fee = P 2.00 / sq.m. Building Permit Fee: 75 x 2.00 = P 150.00 8.3 Construction / addition / renovation / alteration of buildings under CATEGORY II shall be assesed according to the following areas: Manila AREA Metro Cities 1st Class 2ND Class All Others Cities and 1st Class I In sq.m. Fee / Fee / Municipalities Sq.m. sq.m. Fee / sq.m. Fee / sq.m. ----------------- ----------...
View Full Document

This note was uploaded on 09/22/2013 for the course ARIDBE AR taught by Professor Any during the Fall '12 term at Mapúa Institute of Technology.

Ask a homework question - tutors are online