Building Code of the Philippines(1)

Up to 70 hp 26000 above

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ……………… 200.00 j.) Above 50HP up to 60 HP...……………………………………… 240.00 k.) Above 60 HP up to 70 HP...……………………………………… 280.00 l.) Above 70 HP up to 80 HP...……………………………………… 320.00 m.) Above 80 HP up to 90 HP...……………………………………… 360.00 n.) Above 90 HP up to 100HP...……………………………………… 400.00 o.) Every HP or fraction thereof above 100 HP…………………….. 2.00 21.4.13Pressure Vessels, Per cubic meter or fraction thereof …………………………………. 30.00 21.4.14Pneumatics tubes, Conveyors, Monorails for material handling, Per lineal meter or fraction thereof …………………………………. 2.00 21.4.15Testing / Calibration of pressure gauge, per unit………………………. 20.00 21.4.16Gas Meters: Each gas meter tested, proved and sealed: a.) Up to 10 lights ……………………………………………………… 12.00 b.) Above 10 lights up to 50 lights …………………………………. 16.00 c.) Above 50 lights up to100 lights …………………………………. 24.00 d.) Above 100 lights …………………………………………… 12.00 21.4.17Every inspection of mechanical rides used in amusement centers Of fairs, such as ferris wheels, merry-go-rounds; roller coasters And like, per unit ……………………………………………………. 20.00 22. Sign Permit Fees : 22.1 Business Signs: a.) Neon ……………………………………………………………… 30.00 b.) Illuminated ……………………………………………………. 20.00 c.) Others ……………………………………………………………… 12.00 d.) Painted-on ……………………………………………………. 8.00 NOTE:Signs not exceeding 0.20 sq.m. of display surface, and/or temporary signs for charitable, religious and civic purposes are not to obtain a permit. Fees for electrical partsof signs are found in Section 12.1 and 12.3 of this Rule. 22.2 Annual Renewal Fees: Per sq.m. of display surface or fraction thereof; a.) Neon Signs ……………………………………………………… 30.00 Provided that minimum fee shall be ……………………… 120.00 b.) Illuminated signs, …………………………………………………… 15.00 Provided that minimum fee shall be ……………………… 60.00 c.) Painted –on signs …………………………………………… 20.00 Provided that minimum fee shall be ……………………… 20.00 3. Certifications : 23.1 23.2 23.3 23.4 23.5 23.6 23.1 Certified true copy of building permit ………………………………… 4.00 Certified true copy of certification of use/occupancy…………………… . 4.00 Issuanceof certificate of damage ………………………………… 4.00 Certified true copy of Certificate of Damage ………...
View Full Document

This note was uploaded on 09/22/2013 for the course ARIDBE AR taught by Professor Any during the Fall '12 term at Mapúa Institute of Technology.

Ask a homework question - tutors are online