Building Code of the Philippines(1)

With platforms or floors shall be charged an

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: onstruction of reinforced concrete or steel tanks for category I buildings: a.) Up to 2 cu.m. ………………………………………………….Exempted b.) Every cu.m. or fraction thereof in excess of 2 cu. m………………10.00 9.10 Construction of reinforced Concrete Tanks for Commercial / Industrial use: a.) Up to 10 cu.m.……………………………………………………400.00 b.) Every cu.m. or fraction thereof in excess of 10 cu. m. ………. 20.00 9.11 Construction of waste treatment Tanks: (Including Sedimentation and Chemical Treatment Tanks) Per cu.m. of volume ………………………………………………………2.00 9.12 Construction of Steel Tanks for Commercial / Industrial Use: 9.12.1 Above Ground: a.) b.) Up to 10 cu.m………………………………………………………400.00 Ecery cu.m. or fraction thereof in excess of 10 cu.m. Up to 100 cu.m. ……………………………………………………. 20.00 c.) Every cu.m. or fraction thereof in excess of 100 cu.m. Up to 1,000 cu.m…..…..………………………………………….. 16.00 d.) Every cu.m. or fraction thereof in excess of 1000 cu.m. Up to 5,000 cu.m. ………………………………………………… 12.00 e.) Every cu.m. or fraction thereof in excess of 5,000 cu.m. Up to 10,000 cu.m. ……………………………………………….. 8.00 f.) Every cu. m. or fraction thereof in excess of 10,000 cu.m. Up to 20,000 cu.m……………………………………… …………. 6.00 g.) Every cu.m. or fraction thereof in excess of 20,000 cu.m……… 4.00 9.12.2 Underground: a.) Up to 20 cu.m.……………………………………………………..600.00 b.) Every cu.m. or fraction thereof in excess of 20 cu.m.………… 20.00 9.13 Pull-outs and reinstallation of Commercial / Industrial Steel Tanks: 9.13.1 Underground: Per cu.m. or fraction thereof of excavation ………………………….. 2.00 9.13.2 Saddle or trestle mounted horizontal tanks: Per cu.m. or fraction thereof of volume of tanks……………………2.00 9.13.3 Reinstallation of vertical storage tanks shall be considered as new construction. Corresponding fees shall be charged in accordance with Section 9.12.1 above. 9.14 Booths, Kiosks, Platforms, Stages and the like: 9.14.1 Construction of permanent type booths, kiosks, platforms, stages and the like per sq.m. or fraction thereof of floor area ………………… 8.00 9.14.4 Construction of temporary type of booths, kiosks, platforms, satages, field offices, laborer’s quarter and the like: Per sq.m. or fractional thereof of floor area………………………….4.00 9.14.3 Inspection of knock down type temporary booths, platforms, stages and the like per unit ……………………………………………..20.00 10. Construction of Tombs and Canopies, Mausoleums and Niches in Cemeteries And Memorial Parks: Metro-Manila 2nd Class All And Cities and Others 1...
View Full Document

Ask a homework question - tutors are online