Building Code of the Philippines(1)

Zone 814 construction of slipways see note following

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: permit, clearance shall first be obtained by the owner from the proper authority, such as the Philippine Ports Authority, Philippine Cost Guard, Bureau of Public Works, etc. 9. ANCILLARY STRUCTURES: 9.1 Bank and Records Vaults: per cu.m. or fraction there.......................................................................30.00 9.2 Swimming Pools: a.) b.) c.) Residential, per cu.m. or fraction thereof.....................................5.00 Commercial, per cu.m. fraction thereof.......................................15.00 Social/Institutional, per cu.m. or fraction thereof.........................10.00 NOTE:Swimming pools improvised from local indigenous materials such as rocks, stones, and or small boulders and with plain cement flooring shall be charged 50% of the above rates. Ancillary structures to swimming pools, such as shower rooms, locker rooms and the like shall be charged 50% of the rates corresponding to the category of swimming pool, as provided for under Sections 8.2 to 8.4 of this Rule. 9.3 Costruction of firewalls separate from the building: per sq.m. or fraction thereof.........................................................................2.00 Provided, that the minimum fee shall be ..................................................40.00 9.4 Construction/erection of towers: Including Radio and TV towers, water tank supporting structures and like a.) Residential .....................................................................Exempted b.) Commercial/Industrial Self-Supporting Trillon (Guyed) 1. Up to 10 meters 2,000.00 200.00 in height 2. Every meter or 100.00 10.00 fraction thereof in excess of 10m. c.) Institutional 1. Up to 10 meter in height 1,500.00 100.00 2. Every meter or fraction Thereof in excess of 10m. 100.00 10.00 NOTE:Towers with platforms or floors shall be charged an additional fee in accordance with Sections 8.3 to 8.4 of this Rule. 9.5 Commercial/Industrial Storage Silos: a.) Up to 10 meters in height .............................................2,000.00 b.) Every meter or fraction thereof in excess of 10m.................... 100.00 NOTE:Silos with platforms or floors shall be charged an additional fee in accordance with Section 8.3 and 8.4 of this rule. 9.6 Construction of smokestacks and chimneys for commercial / Industrial Use: 9.6.1 9.6.2 Smokestacks: a.) Up to 10 meters in height, measured from the base…200.00 b.) Every meter or fraction thereof in excess 0f 10 m…… 10.00 Chimneys: a.) Up to 10 meters in height, measured from the base……40.00 b.) Every meter or fraction thereof in excess of 10 m………. 1.00 9.7 Construction of commercial / industrial fixed ovens: Per sq.m. or fraction thereof interior floor areas……………………………40.00 9.8 Construction of Industrial Kiln / Furnace:* Per cu.m. or fraction thereof volume…………………………………………10.00 * Furnaces connected with boilers are exempt from this fee. The fee for the boiler includes rhe fee for the furnace. 9.9 C...
View Full Document

Ask a homework question - tutors are online