OOMA User Guide

Appears when you choose initiate and select

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: uipment. 1 Open the specific VED (see "Open a VED" on page 342). 2 Right-click the Serno or icon, choose Initiate, and select Unscheduled. 3 On the Unscheduled Maintenance window, enter the Type WO and then press Tab or Enter. Note 1: Depending upon your assigned SMQ, the system displays only the Type WOs that you are allowed to work on. Only Maintenance Control personnel can initiate QT Type work orders. Note 2: Type work order CP or WR requires the associated MCN or JCN of the repair work order. 446 User Guide Optimized NALCOMIS OMA Note 3: Only U or D equipment status code is allowed. P is not accessible. 4 If initiating a WR, enter the MCN or JCN. Otherwise, continue with the following procedures. 5 Click the Initiate WO button Actions menu. or select Initiate WO from the The Unscheduled Maintenance data window appears with work center and other data fields prefilled. 6 Enter the work center code if other than the default. 7 Modify the appropriate assembly code if other than the default. 8 Enter a serial number in the BUNO/Serno field and leave the WUC/UNS field to read 090. 9 Fill in the remaining required fields and click Save. 10 Click OK when the MCN and JCN Assignment response box appears with the MCN and JCN assigned. Personnel who do not have an automatic JCN SMQ assignment only see the MCN on the work orders they initiate. 11 Respond to the Print prompt accordingly. 12 To initiate another work order, click New Document and repeat steps 2 to 11. Initiate Unscheduled Maintenance Work Order for Non-Aeronautical Equipment The Unscheduled Maintenance window appears when you right-click a Serno or icon on the SE or ALSS VED and choose Initiate, and select Unscheduled. It enables you to initiate an unscheduled maintenance work order for non-aeronautical equipment. 1 Open the specific VED. 2 Right-click the Serno or icon, choose Initiate, and select Unscheduled. 3 On the Unscheduled Maintenance window, enter the Type WO and then press Tab or Enter. 4 If initiating a WR, enter the MCN or JCN. Otherwise, continue with the procedures. 5 Click the Initiate WO button select Initiate WO. or go to the Actions menu and The Unscheduled Maintenance data window appears with the work center and other data fields prefilled. 6 Enter the work center code if other than the default. 7 Modify the default Assy Cd to ZAAA. 8 Enter a serial number in the BUNO/Serno field and leave the WUC/UNS field as 090. Chapter 5 Maintenance Subsystem 447 9 Complete the remaining required data fields and click Save. 10 Click OK when the MCN and JCN Assignment response box appears with the MCN and JCN assigned. Personnel who do not have an automatic JCN SMQ assignment will only see the MCN on the work orders they initiate. 11 Respond to the Print prompt accordingly. 12 To initiate another work order, click New Document and repeat steps 3-11. Unscheduled Maintenance The Unscheduled Maintenance window appears when you initiate an unscheduled maintenance work order. For pr...
View Full Document

Ask a homework question - tutors are online