OOMA User Guide

Status click new and repeat steps 3 and 4 6 click

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: u to identify the IMA Repairable Stock Status information to be displayed. 1 Open the Material Selection Menu (see "How to Access Material Control Subsystem" on page 495). 2 On the Material Selection Menu, click Summary Rpbl STK Status from the IMA Queries group list and click OK. 3 Type the FGC, NIIN, or CAGE and Part Number. 4 Go to the Actions menu and select Retrieve or click Retrieve. The system displays the IMA Repairable Stock Status information. 5 To query another IMA repairable stock status, click New and repeat steps 3 and 4. 6 Click Close to return to the Material Selection Menu. X-Ref Data - Supply This window enables you to identify the IMA Cross Reference information to be displayed. 1 Open the Material Selection Menu (see "How to Access Material Control Subsystem" on page 495). Chapter 6 Material Control Subsystem 507 2 On the Material Selection Menu window, click X-Ref Data - Supply from the IMA Queries group list and click OK. 3 Type the Cross Reference information. 4 Type CAGE and Part Number, or NIIN. 5 Go to the Actions menu and select Retrieve. -orClick Retrieve. The system displays the IMA Cross Reference information. 6 To query another IMA cross reference, click New and repeat steps 3 to 5. 7 Click Close to return to the Material Selection Menu window. Material Control Register Report This window enables you to generate the Material Control Register Report. The report reflects the report types, requisition status, requisition types, or whether direct or indirect requisitions within a specified period of time, sorted by DDSN, Modex, or Status Date/Time. 1 Open the Material Selection Menu (see "How to Access Material Control Subsystem" on page 495). 2 On the Material Selection Menu, select Material Control Register Report from the OMA Queries/Reports group list and click OK. 3 On the Material Control Register Report prompt, set the criteria by selecting them from available lists. 4 Set criteria by selecting data from available fields. 5 Enter the Start Date and End Date in DD MMM YY format, or double-click the Start Date and End Date fields to display the CalendarCalendar to select the date. 6 Select Screen or Printer, or select both in the Report To box. 7 Click OK. The system displays the Material Control Register Report. 8 To generate another Material Control Register Report, click Report Selection to display the selection window. Repeat steps 2 through 7. 9 Click Close to return to the previous window. Material Control - Material Requisition Query This window enables you to view data for a completed requisition. 1 Open the Material Selection Menu (see "How to Access Material Control Subsystem" on page 495). 2 On the Material Selection Menu, click X-Ref Data - Supply from the IMA Queries group list and click OK. 508 User Guide Optimized NALCOMIS OMA 3 On the Material Control - Material Requisition Query window, click the DDSN field to display the list of completed requisitions. 4 Select the...
View Full Document

This note was uploaded on 10/01/2013 for the course ECON 101 taught by Professor Smith during the Fall '13 term at Voorhees.

Ask a homework question - tutors are online