B sinh allahabad jpfnntrndino surveyor central public

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ing College, DR R. B. SIN~H Allahabad &JPF,NNTRNDINO SURVEYOR Central Public Works Department (Aviation ) OF WOR~~(AVUTION) Sm ?EsEDOL zzLl-%LL) _ 08 WORR8 MO SURVSYOR ( AVIATION ) ( Alkmatc SUPRRmTRNDINo SURVEYOR ) OF Central Public Works Department womub(I) !klRVRYOR OF WORK.3 ( I) A~ACHED TOSUPERINTENDllp0 ,%RYFiYOR OF WOW (1) (Akemola) TEoRNxoALFxAMxNlul &IRKB. K. UPPAL SHRI P. S. RAO ( Akm.~tr ) SERID. AJITIZASIYHA, Director ( Civ Engg ) Building & Communication Department, Government of Maharashtra Bhakra Management Board, Nangal Township Director General, BIS ( &-O&O Mmbcr ) SHN K. M. Assistant &fATHUR Director ( Civ Engg ), BIS 2 IS : 1200 ( Part VII) - 1972 Indian Standard METHOD OF MEASUREMENT OF BUILDING AND CIVIL ENGINEERING WORKS PART VII HARDWARE ( Second Revision j 0. FOREWORD 0.1 This Indian Standard (Part VII ) ( Second Revision ) was adopted by the Indian Standards Institution on 17 May 1972, after the draft finalized by the Civil Works Measurement Sectional Committee had been approved by the Civil Engineering Division Council. 0.2 Measurement occupies a very important place in the planning and execution of any civil engineering work from the time of first estimates to the final completion and settlement of payments for a project. Methods f~.lli~wtvI fr meilslrrcmrnt ___. -.._ -__. are n_oL un_iform aurd con_siderab!e differen_ces --_“___. . -_ .Li ___exist between practices f&owed by different construction agencies and various Central and State Government Departments. also between While it is recognized that each system of measurement has to be specifically related to administrative and financial organizations within a department responsible for the work, a unification of various systems at technical level has been accepted as very desirable specially as it permits a wider range of operation for civil engineering contractors and eliminates ambiguities and misunderstandings of various systems followed. 0.3 Among various civil engineering items, measurement of buildings was the first to be taken up for standardization and this standard having provisions relating to building work was first published in 1958’ and was revised in 1964. 0.4 In the course of usage of this standard by various construction agencies in the country, several clarifications and suggestions for modifications were received and as a result of study, the technical committee responsible for this standard decided to cover method of measurement for civil engineering works like industrial and river valley projects. 0.5 For the purpose of xtandard is complied expressing the result of with IS : 2-1960*. The off value should be the deciding whether a particular requirement of this with, the final value, observed or calculated, a measurement, shall be rounded off in accordance number of significant places retained in the rounded same as that of the specified value in this standard. *Rules for rounding off numerical values ( rc&cd). 3...
View Full Document

Ask a homework question - tutors are online