MATERIAL SCHEDULE (final)(2).pdf - 3 BEDROOM UNIT(TYPE A MATERIAL SCHEDULE UNIT 1 2 3 4 5 6 7 8 9 10 11 12 13 DESCRIPTION roughly dresses foundation

MATERIAL SCHEDULE (final)(2).pdf - 3 BEDROOM UNIT(TYPE A...

This preview shows page 1 - 2 out of 2 pages.

UNIT DESCRIPTION UNIT QTY RATE AMOUNT 1 roughly dresses foundation stones fts 1400 38 53200 2 cement bags 420 600 252000 3 sand tonnes 68 1500 102000 4 machine cut stones pcs 2600 45 117000 5 ballast tonnes 42 1200 50400 6 DPC(1000 gauge polythene sheet) roller 1 3500 3500 7 DPM(1000gauge polythene sheet) roller 2 3500 7000 8 hardcore lorries 3 6000 18000 9 antitermite chemical spray provision sum 1 5000 5000 10 D12 PCS 76 1110 84360 11 D10 PCS 33 850 28050 12 D8 PCS 60 650 39000 13 Overall site excavation provision sum 1 30000 30000 ROOFING 14 150*50mm rafters fts 800 80 64000 15 150*50mm hips fts 100 80 8000 16 150*50mm tie beams fts 180 80 14400 17 150*50mm valleys fts 110 80 8800 18 150*50mm ridge fts 75 80 6000 19 100*50mm strut and ties fts 400 80 32000 20 200*25mm fascia board fts 240 90 21600 21 100*50mm wall plate fts 335 60 20100 ROOF COVERINGS(versatile) 22 2 m 10 750 7500 23 2.5 m 13 750 9750 24 2.7 m 11 750 8250 25 3 m 10 750 7500 3- BEDROOM UNIT(TYPE A) MATERIAL SCHEDULE
26 3.3 m 2 750 1500 27 3.6 m 5 750 3750 28 4 m 1 750 750 29 4.5 m 4 750

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture