Assignment_4.pdf - To assist Eileen please answer the...

This preview shows page 1 - 3 out of 3 pages.

To assist Eileen please answer the following questions. For all questions consider table equivalents – a table equivalent is 2 table legs. 1. Draw a Value Stream Map for the table assembly line. Show all activity steps, material flows, information flows and inventories. Draw a timeline showing processing times and waiting times. (You may use any drawing package including powerpoint to create a legible chart. You can also use a package such as Visio or Lucidcharts to draw your chart. You will need to make a free account to use Lucidcharts software if you choose to use it. - mapping) (6 points)
2. Calculate the Takt time in minutes for the table assembly process. (1 point) Takt time is = time that is available / customer demand = 8 hour shift * 60 mins per hour/ 200 tables per day = 2.4 minutes. demand for tables per week is 1000/ 5 working days = 200 tables per day.

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture