Quiz 12 1. Select the correct answer for Bottleneck machine and current capacity of the line in the attached figure MC1, 5 2. What scheduling system is used in theory of constraints to schedule production? Drum- Buffer-rope 3. According to TOC a constraint can be : The company policy to achieve equipment utilization/ The Bottleneck machine/A company norm for utilizing standard lot size all 4. According to TOC, to manage a business well: We need to manage the constraint 5. Drum rate in TOC is the: Constraint resource rate or CR production rate 6. The way to calculate throughput in the theory of constraints is to subtract the production cost of product from its price . False The way to calculate throughput in the theory of constraints is to subtract the raw material costs from sales. 7. The main idea behind the theory of constraints is that all organizations exist to achieve a goal, and in most cases the goal is to make money. TRUE 8.

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture