The us must build a national high speed rail network

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: been a serious issue for years, which begs the question, what must be done differently in order to achieve the results necessary to be effective, especially in the face of growing global competition? The talent challenges facing U.S. manufacturers are, to some extent, illustrative of the challenges facing a host of industries worldwide. As such, understanding the factors contributing to this performance-threatening skills gap is instructive.>> Manufacturing sector in crisis-Lowest it’s been in 3 years REXRODE, Business writer for the Associated Press, 7-2-2012 (Christina, Stocks mixed as American manufacturing slows,July 2, 2012, https://mail.google.com/mail/u/0/?shva=1#inbox/1384a6ec3249a4b2, July 2, 2012; FAS) (Stocks struggled to stay out of the red in quiet holiday-week trading after a trade group said American manufacturing shrank in June for the first time in almost three years. The Dow Jones industrial average was higher in early trading but fell after the manufacturing report came out at 10 a.m. EDT and never recovered. It finished down 8.70 points at 12,871.39. The Standard & Poor's 500 and the Nasdaq composite index both finished slightly higher after...
View Full Document

This note was uploaded on 11/30/2013 for the course PHILOSOPHY 303m taught by Professor Tye during the Fall '12 term at University of Texas.

Ask a homework question - tutors are online