lecture 7 Power, Transmission_v.2

Indeed re 2 makes evident that the i lateral trading

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: P1 + 2 P2 ≤ 660 simultaneous feasibility constraints in this case. The dispatch of the system and the allocation of transmission property rights must lie within this feasible set. b d c a Figure 2: Simultaneous feasibility set of the network in Figure 1, without losses. Figure 2 makes evident that the dispatched quantities (q1 and q2) are not independent of each other. Indeed, it could appear feasible to dispatch 300 MW of q1 and 220 MW of q2, if they were separately considered. However, in Figure 2, point A is clearly infeasible. This is, when the two transmission bundles are simultaneously dispatched, the combination violates the capacity of line (2,3). re 2 depicts (as the shaded area) all possible combinations of q1 and q2 that would meet the ultaneous feasibility constraints in this case. The dispatch of the system and the allocation of smission property rights must lie within this feasible set. G2 Bus 2 Bus 1 G1 Figure 2: Simultaneous feasibility set of the network in Fig...
View Full Document

This document was uploaded on 12/08/2013.

Ask a homework question - tutors are online