S e sp at the beginning of process the tool quill

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: contouring. S E SP At the beginning of process, the tool quill should be at machine home position H0. Take SP (0,0) as fixture offset position H1 and tool height offset position O1. Start contouring from S and move in anti-clockwise direction and end at point E. After completion, the tool should come back to its home position H0 E2 - 1 Solution for Exercise - 2 1) Set up for machine (a) Mount the workpiece on machine table with clamps as shown in Figure 1. The workpiece is raised from the table to avoid the tool touching the table during cu...