R710 Exchange virutalization

Click customize next to maintenance interval remove

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: de This database can be overwritten by a restore. Click Customize next to Maintenance interval. Remove all blue from the boxes so the system will not perform maintenance, and click OK. At the Public Store Properties window, click Apply. When a warning message appears, click Yes. When the message that the database files have been moved appears, click OK. Click OK to close the Public Store Properties window. In the left pane of the Virtual Infrastructure Client, right-click the MailServer1 VM, and select Install VMware Tools. At the Install Tools pop-up window, click OK. Click Next through the Installation Wizard to install the VMware Tools. This process accepts all defaults. When the installation completes, click Finish. Click Yes to reboot the virtual machine. In the left pane of the Virtual Infrastructure Client, right-click the MailServer1 VM, and select Edit Settings. Click Upgrade Hardware. Click Next through the Installation Wizard to install the virtual hardware upgrade. This process accepts all default...
View Full Document

Ask a homework question - tutors are online