{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

1-20chapter stats

32313 34347 b 30693 35697 c 2768 3898 d 32911

Info icon This preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: subgroups of size four are being used to monitor the tire diameter size of a new radial tire manufactured by a tire company. The and R charts are found to be in statistical control with inches. A histogram of the tire diameter measurements indicates that distribution of these measurements is approximately normally distributed. Calculate the estimate of the percentage of tires that are out of specification. A. 1.93% B. 2.68% C. 1.62% D. 17.36% 1-1685 Chapter 01 - An Introduction to Business Statistics 99. Suppose that and R charts are based on subgroups of size four are being used to monitor the tire diameter size of a new radial tire manufactured by a tire company. The and R charts are found to be in statistical control with inches. A histogram of the tire diameter measurements indicates that distribution of these measurements is approximately normally distributed. Find the sigma level capability of the process. A. 1.93 B. 3.22 C. 0.64 D. 0.22 100. Among other quality measures, the quality of an electronic component used in manufacturing stereo speakers is monitored with a p-chart. In the last 25 days daily samples 60 units resulted in the following number of defective units per sample: 8, 4, 3, 7, 6, 2, 5, 3, 1, 0, 7, 4, 2, 0, 1, 6, 2, 4, 3, 1, 2, 8, 5, 6, 0. Determine the center line for this process. A. .06 B. .03 C. .001 D. .056 101. Among other quality measures, the quality of an electronic component used in manufacturing stereo speakers is monitored with a control chart. In the last 25 days daily samples 60 units resulted in the following number of defective units per sample: 8, 4, 3, 7, 6, 2, 5, 3, 1, 0, 7, 4, 2, 0, 1, 6, 2, 4, 3, 1, 2, 8, 5, 6, and 0. Determine the appropriate upper and lower control limits for this process. A. (.029 .091) B. (.056 .064) C. (0 .152) D. (0 .202) 1-1686 Chapter 01 - An Introduction to Business Statistics 102. The quality of an electronic component used in manufacturing cell phones is monitored with a p-chart. In the last 20 days daily samples of 75 units resulted in the following number of defective units per sample: 8, 4, 3, 7, 3, 1, 0, 7, 4, 2, 0, 1, 6, 2, 4, 3, 1, 2, 8, 5 Find the appropriate center line. A. .0473 B. .2667 C. .1067 D. .0133 103. The quality of an electronic component used in manufacturing cell phones is monitored with a p-chart. In the last 20 days daily samples of 75 units resulted in the following number of defective units per sample: 8, 4, 3, 7, 3, 1, 0, 7, 4, 2, 0, 1, 6, 2, 4, 3, 1, 2, 8, 5 Find the LCL and UCL for the p-chart A. (0 .1208) B. (.0228 .0718) C. (0 .1897) D. (.0445 .0501) 104. The quality of an electronic component used in manufacturing cell phones is monitored with a p-chart. In the last 20 days daily samples of 75 units resulted in the following number of defective units per sample: 8, 4, 3, 7, 3, 1, 0, 7, 4, 2, 0, 1, 6, 2, 4, 3, 1, 2, 8, 5 If on the 21st day, 9 defective units were found in the sample of 75 units, would the process be in control? A. Yes B. No 1-1687 Chapter 01 - An Introduction to Business Statistics 105. Suppose that and R charts are based on subgroups of size four are being used to monitor the tire diameter size of a new radial tire manufactured by a tire company. The and R charts are found to be in statistical control with inches. A histogram of the tire diameter measurements indicates that distribution of these measurements is approximately normally distributed. Compute the natural tolerance limits for this process. A. (48.68 52.32) B. (49.89 51.11) C. (48.86 52.14) D. (46.75 54.25) 106. A motorcycle manufacturer produces the parts for its vehicles in different locations and transports them to it plant for assembly. In order to keep the assembly operations running efficiently, it is vital that all parts be within specification limits. One important part used in the assembly is the engine camshaft and one important quality characteristic is the case hardness depth. Specifications state that the hardness depth must be between 3.0 mm and 6.0 mm. To investigate the process, the quality control engineer selected 25 daily subgroups of n = 5 and measured the hardness depth. The process yielded a mean of the means = 4.50 and an average range = 1.01. Calculate the center line for the X-bar chart. A. 1.01 B. 4.50 C. 3.49 D. 0.90 107. A motorcycle manufacturer produces the parts for its vehicles in different locations and transports them to it plant for assembly. In order to keep the assembly operations running efficiently, it is vital that all parts be within specification limits. One important part used in the assembly is the engine camshaft and one important quality characteristic is the case hardness depth. Specifications state that the hardness depth must be between 3.0 mm and 6.0 mm. To investigate the process, the quality control engineer selected 25 daily subgroups of n = 5 and measured the hardness depth. The process yielded a mean of the means = 4.50 and an average range = 1.01. Calculate the center line for the R chart. A. 1.01 B. 0.22 C. 4.50 D. 0.90 1-1688 Chapt...
View Full Document

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern