8

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ervations, such as pore pressure test results, gas‐cut drilling fluid, and well kicks to adjust the drilling fluid program and the setting depth of the next casing string. 30 CFR § 250.446(a) – BP and Transocean failed to maintain the BOP system in accordance to API RP 53 section 18.10 and 18.11. This list of violations is based upon the evidence gathered by the JIT during its investigation and upon the Panel’s findings and conclusions. Additional evidence may reveal further violations. After this Report is released, BOEMRE will issue Incidents of Non‐Compliance based upon evidence contained in this Report and/or other relevant evidence. 423 173 30 CFR §1721(a)– BP failed to conduct the negative test on April 20 in accordance with the negative test procedure approved in the April 16 APM. 174 XV. Policies and Practices of Involved Companies A. BP’s Policies and Practices The Panel’s investigation found that, at the time of the blowout, BP had a number of carefully documented policies and practices addressing drilling operatio...
View Full Document

This note was uploaded on 01/18/2014 for the course BEPP 305 taught by Professor Nini during the Fall '11 term at UPenn.

Ask a homework question - tutors are online