Duringtheseattemptsitwasdiscoveredthatthe

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: t the affected component. 5. Additional BOP Tests At the time of the blowout, the regulation included additional subsurface BOP testing requirements, including the following: Stump test of a subsea BOP system with water before installation; Alternate test between control stations and pods; Pressure test of the BSR during stump test and at all casing points; An interval between any BSR pressure test not exceeding 30 days; A pressure test of test variable bore‐pipe rams against the largest and smallest sizes of pipe in use, excluding drill collars and bottom‐hole tools; A pressure test of affected BOP components following the disconnection or repair of any well‐pressure containment seal in the wellhead or BOP stack assembly; A function test of annulars and rams every seven days between pressure tests; and Actuation of safety valves assembled with proper casing connections before running casing. 171 6. BOP Recordkeeping 30 CFR § 250.450. required lessees to record the time, date and results of all pres...
View Full Document

This note was uploaded on 01/18/2014 for the course BEPP 305 taught by Professor Nini during the Fall '11 term at UPenn.

Ask a homework question - tutors are online