Theuseofnitrifiedcementin bphzncec011406

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: t of 5-1/2" 21.9 ppf S-135 (3450' of pipe) 14.1 ppg 17,684’-17,693’ M57C sand (brine) 22" @ 7937' MD/TVD (2891' bml) 13.1 ppg M56A sand 17,786’-17,791’ 8,367' MD (3-1/2" - 800' pipe) 18" @ 8969' MD/TVD (3902' bml) 18,061’-18,073’ 12.6 ppg M56E sand 18,104’-18,175’ 18,202’-18,223’ 16" @ 11,585 MD / TVD (6518' bml) XOVER 12,487.64' 13-5/8" @ 13,145' MD / 13,133' TVD 7” shoe 18,304’ 11-7/8" Liner @ 15,103' MD / 15,092' TVD Float Collar 18,115’ 9-7/8" Liner @ 17,168' MD / 17,157' TVD TD @ 18,360' MD / 7" Shoe @ 18,303.92' MD Figure 3 ‐ Macondo Well Shoe Track and Hydrocarbon Intervals H. Designing the Production Casing – Long String versus Liner BP drilled the Macondo well to a hydrocarbon‐bearing zone and planned to return to this zone at a later date to complete the Macondo well for production. Before moving the Deepwater Horizon rig off of the Macondo well, BP chose to set a production casing that would be used to extract...
View Full Document

Ask a homework question - tutors are online