cbtruebl_HW4

Walls backfill for slab on grade gradepour floor slab

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: r, Cure&Strip Int. Walls Backfill for Slab on Grade Grade&Pour Floor Slab Activity Te 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Critical Path: 2.00 3.00 4.50 4.00 7.00 6.83 11.33 9.00 6.00 15.67 10.00 6.00 1.00 5.00 20 ­50 ­80 ­110 ­130 ­140 constant constant t a, t m , t b constant t a, t m , t b t a, t m , t b t a, t m , t b constant constant t a, t m , t b constant constant constant constant Va 0.00 0.00 0.69 0.00 0.11 0.69 1.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 Duration Followed by (Weeks) 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Activity Act# 2 3 3,4,8 4 6,7,8 5,7,10 9,11,15 9 6 12,16,18 10 6 1 5 40 50,60,70 60,70 80,90,100 80,90,100 110 110 110 120 140 130 140 140 END Expected ti...
View Full Document

This document was uploaded on 01/19/2014.

Ask a homework question - tutors are online