ch2_delivery_2

A the contractor shall ensure that all such plant and

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: sufficiency in the design of the Works … the like liability to the Employer, … , as would an appropriate professional designer holding himself out as competent to take on the design of the Works. – (a) … the Contractor shall ensure that all such Plant and materials are reasonably fit for the purpose intended by the Contract. 42 FIDIC (International Federation of Consulting Engineers) • FIDIC now represents most of the private practice consulting engineers in the world. • The 1999 Suite of Standard Conditions of Contract – Conditions of Contract for Construction (The Red Book) – Conditions of Contract for Plant and Design-Build (The Yellow Book) – Conditions of Contract for EPC Turnkey Projects (The Silver Book) – Short Form of Contract (The Green Book) • The Red and Yellow Books: traditional competitive tendering • Red Book: building and engineering works designed by Employer • Yellow Book: E&M plant, building and engineering works designed by the Contractor 43 FIDI...
View Full Document

This document was uploaded on 01/28/2014.

Ask a homework question - tutors are online