ch1_intro_2

Funding for construction i bidding process for

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: n) D. Funding for detailed design E. Detailed design F. Endorsement of Environmental Impact Assessment (EIA) report G. Issuing Environmental Permit H. Funding for construction I. Bidding process for constructor J. Commencement of construction works 49 References • Halpin, D. W. (2006). Construction Management, 3rd edition, John Wiley & Sons, Inc. • Ireland, V. (1982) Virtually Meaningless Distinctions Between Nominally Different Procurement Methods. • Konchar, M. (1997) "A comparison of United States project delivery systems", Technical Report No. 38, Department of Architectural Engineering, the Pennsylvania State University. • Schmenner, R. (1993). Production/Operations Management: From the Inside Out (5th edition), Prentice Hall, Englewood Cliffs, NJ. • Gallaher, M. P., O’Connor, A. C., Dettbarn, J. L., and Gilday, L. T. (2004). "Cost Analysis of Inadequate Interoperability in the Capital Facilities Industry." National Institute of Standards and Technology (NIST). • De Marco, A. (2011) Project Management for Facility Constructions – A Guide for Engineers and Architects, Springer, London, UK. 50...
View Full Document

Ask a homework question - tutors are online