ch1_intro_2 - 1.2.8 Facility Project Team(Stakeholders The...

Info icon This preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
1.2.8 Facility Project Team (Stakeholders) The key roles in a construction project: – Owner Designer (Architect and Engineer) (A/E) Constructor/Builder (commonly named as “Contractor”) Other common roles (in contract): – Subcontractors Material suppliers 30 Owner Constructor Designer
Image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon