ch1_intro_1

Ch1_intro_1

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: responsible bidder with the lowest bid price • Request for Proposal (Notice to Bidders) for public announcement • Pros: – Competition ensures lowest responsible price. – All bidders are treated equally • Cons: – Purposely low bid (zero or negative profit) – Frequent change orders may be resulted – Plans and specifications must be totally completed prior to bid advertisement long project duration 18 Selective Bidding (Prequalification) • Reduced number of prospective bidders • Win-win situation: The contractor does not prepare a bid and incur the inherent cost unless he can qualify. The owner does not find himself in a position of being under pressure to accept a low bid from an incompetent firm. • Major prequalification parameters of the bidders: – Technical competency of similar types of construction – Past project experience – Current financial...
View Full Document

This document was uploaded on 01/28/2014.

Ask a homework question - tutors are online