ch7_project_mgt_2 - 5.4 Verify Scope The process of...

Info icon This preview shows pages 1–9. Sign up to view the full content.

View Full Document Right Arrow Icon
5.4 Verify Scope The process of formalizing acceptance of completed project deliverables . It includes reviewing deliverables with customer or sponsor, and obtaining formal acceptance of deliverables by the customer or sponsor. 25 Project management plan contains the ________________ , which include (1) project scope statement, (2) WBS, and (3) WBS dictionary. _______________ includes activities such as measuring, examining, and verifying to determine whether work and deliverables meet requirements and product acceptance criteria. Change requests : Completed deliverables that have not been formally accepted are documented, along with the reasons for non-acceptance. Those deliverables may require a change request for defect repair.
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
5.5 Control Scope The process of monitoring the status of the project and product scope and managing changes to the scope baseline. It ensures all requested changes and recommended corrective or preventive actions are processed through the Perform Integrated Change Control process (Process 4.5). 26 Variance analysis : assess the magnitude of variance from the original scope baseline. It also includes determining cause of variance and deciding whether corrective or preventive action is required.