{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

hw1_Linbeck+_ch3+lean_

hw1_Linbeck+_ch3+lean_ - HW1 Lean Construction(Linbeck Case...

Info icon This preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
HW1 - Lean Construction (Linbeck) Case Discussion Renovation / remodeling project of the Chemistry Building at Rice University, Houston, Texas, USA The building: built in 1925 Renovation of 70-year old building not an easy task Construction contract: US $22M ; entire project: US $28.5M Construction duration: 12 months Time of study: 85% project completion Procurement: contractor (all material incl. laboratory equipment); owner (furniture) Staffing: 1 PM, 2 project engineers, 1 superintendent, 1 assistant superintendent, 15 foremen (9 from subcontractors), and 78 craftsmen (65 from subcontractors) First Lean Construction project for all project participants (owner, designer?, General Contractor, subcontractors) 1
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon