Determine 10 pts the total volume of borrow soil in

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: e: (10 pts) The total volume of borrow soil (in cubic feet) that will be required from the quarry site to fill the excavation; (10 pts) The total weight of the borrow soil that needs to be transferred from the quarry to the building site, in order to achieve the specifications above (show your calculations clearly with proper units); and (10 pts) The total volume of water (in cubic feet) that need to be added to the borrow soil at the building site in order to compact it to the target conditions. Page 2 of 2...
View Full Document

Ask a homework question - tutors are online