Sun_25.2.10_Geo

Sun_25.2.10_Geo

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: proposed scheme; construction method & work sequence; design assumptions; presentation of stability assessment and design) 6. Conclusions 7. Recommendations (further GI, construction monitoring, long-term maintenance etc.) Project Project Design Requirements Au Tau Site Prepare a ground investigation plan to facilitate detailed design of site formation and foundation works • Deliverable should include a ground investigation plan with borehole locations • The plan should also indicate the proposed field testing, sampling and instrumentation Design Design Project Requirements Fo Tan Site Project Project Design Requirements Fo Tan Site Design preliminary site formation works to accommodate the three buildings • Deliverable should include a preliminary site formation plan with adequate sections and details to illustrate the works • The plan should be adequately detailed to facilitate a preliminary cost estimate P...
View Full Document

This document was uploaded on 02/04/2014.

Ask a homework question - tutors are online