Sun_25.2.10_Geo

6neac33 6ne acr32 deliverable should include a

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Upgrading N N N N Y N N Project Project Design Requirements Au Tau Site Design preliminary site formation works assuming 6NE-A/F125 is substandard, and the stability of three other slopes is uncertain (6NE-A/C3, 6NEA/C33, 6NE-A/CR32) • Deliverable should include a preliminary site formation plan with adequate sections and details to illustrate the works • The plan should be adequately detailed to facilitate a preliminary cost estimate Project Project Design Requirements Au Tau Site Prepare Preliminary Site Formation Design Report 1. Introduction (project background; what does report cover?) 2. Site Description (location; topography; adjoining buildings, slopes etc.; anything else the reader should know) 3. Subsurface Conditions (geology; soil stratigraphy based on existing GI data; groundwater conditions) 4. Geotechnical Parameters (assessed from GI & lab test data) 5. Engineering (design options;...
View Full Document

Ask a homework question - tutors are online