Thecurrentrawmaterialsis100kgbyincreasingto110kgstaysw

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 00000000.0000 3.6000 1b. In the above output we see that raw materials have an upper bound of 113.8462 for which the current policy remains optimal. The current raw materials is 100kg, by increasing to 110kg stays within the allowable range of changes, and the current policy does not change. 1c. Likewise, the output shows a lower bound for labour hours of 105.4054 which makes 120­20=100hrs of labour fall outside the allowable range of changes, and the current policy will no longer be optimal under this constraint change. 1d...