107 110 119 status reporting and assessment 31 58 65

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Budget (OMB) 25, 79 Operations concept 9, 14, 17. 22, 68-70, 73, 77, 86, 101 Operations research 7 Optimization 3, 6, 7, 9, 13, 67, 72, 80, 83, 119 Optimum repair level analysis (ORLA) 98 Orbital Replacement Unit (ORU) 80, 87, 97, 98, 132-134 Outer Space Treaty 115 Parametric cost estimation 80-83 Partitioning—see interfaces Payload 17, 20, 132 classification 38, 93, 95, 105, 123 nuclear—see nuclear safety PERT 33, 39, 42 Physical Configuration Audit (PCA) 48, 58, 96 Precedence diagram 34 Preliminary Design Review (PDR) 17, 18, 21, 22, 25, 45, 52,56,58,59,96, 106, 115 NASA Systems Engineering Handbook Present Discounted Value (PDV) 79, 80 Probabilistic Risk Assessment (PRA) 39, 42, 44, 76, 86, 94, 115 Probability distribution 5, 10, 38-43, 63, 88, 89, 92 Problem/Failure Reports (P/FR) 64, 95, 96, 108, 110 Producibility 111, 112 models 111 Producing system (as distinct from the product system) 1, 27, 59, 64 Product Breakdown Structure (PBS) 27, 30-33, 59, 61, 120 Product development process 8, 13, 20-22 Product development teams (PDT) 22, 25, 27, 56, 91 Product improvement 11, 78, 103 Product system 1, 27, 99 Program, level of hierarchy 3 Program/project control xi, 44, 59-61 Program Operating Plan (POP) 25 Project level of hierarchy 3 management (see also system management) xi, 27, 37, 46, 55, 59, 79 plan 17-19, 28-30, 48, 49 termination 49 Project life cycle NASA 13-20 technical aspect of 20-26 Protoflight 106 Prototype 13 Quality of systems engineering process 64, 65, 75 as a facet of effectiveness 84, 85 Quality Assurance (QA) 6, 29, 49, 52, 91, 94-96, 119 Quality Function Deployment (QFD) 7 Queueing theory 7 Red team 49 Reference mission 9, 69 Reliability 6, 22, 80, 91 -95, 98, 100 block diagrams 94 definition of 91 in effectiveness 72, 84-87, 132 engineering 41, 91-93 models 89, 94, 95 in SEMP 29, 93, 119 in TPM 61 Reporting—see status reporting and assessment Requirements 3, 6, 11, 14, 17, 22, 26, 28-30, 37, 45, 46, 51-54,56, 58, 59, 64-68, 80, 92, 103 allocation of 11, 29, 129 analysis 7, 9, 83, 127 as part of the baseline 4, 8, 17, 18, 44, 45 documentation 14, 18, 38 functional 9, 18, 50, 58, 61, 69, 77, 83, 95, 102, 103 interface 9, 17, 50, 57, 127 margin 62 64 performance 6, 9, 18, 28, 50, 58, 59, 61, 68, 70, 73, 74, 77, 83, 95, 103 reviews 17, 45, 49, 50, 55-57 role of 27 software 55-57 specialty engineering 45, 92 traceability 17, 28, 30, 48, 49, 57 verification 22, 45, 57, 58, 61, 93, 95, 96, 103 -111 Reserves project 18, 37, 43, 44, 60, 88 schedule 18, 35, 43 Resource leveling 3...
View Full Document

This document was uploaded on 02/26/2014 for the course E 515 at University of Louisiana at Lafayette.

Ask a homework question - tutors are online