Have the test cases been reviewed and analyzed for

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: diness of SoSR product preparation: • • • • • • • • • • • • Criteria for Successful Completion —The following items comprise a checklist to aid in determining the readiness of TRR product preparation: • • Are functional CSCI descriptions complete and clear? Are the software requirements traceable to the system specification? Are CSCI performance requirements complete and unambiguous? Are execution time and storage requirements realistic? Is control and data flow between CSCIs defined? Are all software-to-software and software-to-hardware interfaces defined? Are the mission requirements of the system and associated operational and support environments defined? Are milestone schedules and special delivery requirements negotiated and complete? Are the CSCI specifications complete with respect to design constraints, standards, quality assurance, testability, and delivery preparation? Results of Review —Successful completion of the SoSR results in release of the software specifications based upon their development requirements and guidelines, and the start of preliminary design activities. Test Readiness Review. Purpose —The Test Readiness Review (TRR) ensures that the test article hardware/software, test facility, ground support personnel, and test procedures are ready for testing, and data acquisition, reduction, and control. Timing— Held prior to the start of a formal test. The TRR establishes a decision point to proceed with planned verification (qualification and/or acceptance) testing of CIs, subsystems, and/or systems. Objectives—The objectives of the review are to: Confirm that in-place test plans meet verification requirements and specifications Confirm that sufficient resources are allocated to the test effort Examine detailed test procedures for completeness and safety during test operations Determine that critical test personnel are testand safety-certified Confirm that test support software is adequate, pertinent, and verified. • • • Have the test cases be...
View Full Document

This document was uploaded on 02/26/2014 for the course E 515 at University of Louisiana at Lafayette.

Ask a homework question - tutors are online