Time fencing ensures a reasonable controlled flow

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: to make changes. Time fencing ensures a reasonable controlled flow through production system. There are opportunities to introduce changes MPS is frozen in initial period when orders are received.A moderate changes allow changes in specific products if parts are available Basic ERP System Time facing Master Production Schedule (MPS). Frozen Moderate Flexible Forecast & available capacity Capacity From Customer Orders 8 15 Time in weeks 26 Basic ERP System Bill of Materials(BOM) A particular finished product is made up of raw material ,parts,assemblies,sub- assemblies.They are arranged in sequential order as per production requirement. The BOM file is important input to ERP. It is also called product structure or product tree. It can be sorted as part number ,assembly wise or level of procurement wise. BOMs are constantly revised as per latest changes & correct version is used for production Basic ERP System Bill of Materials(BOM) Basic ERP System Bill of Materials(BOM) Basic ERP System Bill of Materials(BOM) Basic ERP System Bill of Materials(BOM) Basic ERP System Material Requirement Planning This program works on the in...
View Full Document

This document was uploaded on 02/26/2014 for the course E 515 at University of Louisiana at Lafayette.

Ask a homework question - tutors are online