Suggested processing alternatives for each of the

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: shown in Table B-1. Table B-1: Processing of CLTU Elements Element Implementation Procedure Modulation Start Acquisition Sequence CLTU “Start” Start Sequence A: 0 error in start seq. B: 0 or 1 error in start sequence CLTU “Data Unit” Codeblock A: Triple error detection B: 1-bit error correction CLTU “Finish” Tail Sequence Idle Sequence Codeblock rejection Codeblock rejection Modulation End Physical link Stop modulation (post-CLTU): A: PLOP-1 B: PLOP-2 The overall performance for different combinations of the above strategies (plus variables such as CLTU length) is given in Reference [C2]. Accordingly, the recommended Channel Service strategies are as shown in Table B-2. Table B-2: Recommended Strategies Strategy CLTU Start CLTU Data Unit Modulation End 1 A A A or B 2 B B A or B CCSDS 201.0-B-3 Page B-9 June 2000 CCSDS RECOMMENDATION FOR TELECOMMAND: CHANNEL SERVICE ANNEX C INFORMATIVE REFERENCES (This annex is not part of the Recommendation.) [C1] Procedures Manual for the Consultative Committee for Space Data Systems . CCSDS A00.0-Y-7. Yellow Book. Issue 7. Washington, D.C.: CCSDS, November 1996. [C2] Telecommand: Summary of Concept and Rationale. Report Concerning Space Data Systems Standards, CCSDS 200.0-G-6. Green Book. Issue 6. Washington, D.C.: CCSDS, January 1987. CCSDS 201.0-B-3 Page C-1 June 2000...
View Full Document

Ask a homework question - tutors are online